mdot hma selection guidelinesmdot hma selection guidelines

mdot hma selection guidelinesmdot hma selection guidelines

The amount of crown that can be introduced into the screed varies with the width of the basic screed and with the make and model of the equipment. A multi-unit culvert is considered a bridge if the total length, as measured along the centerline of the roadway, is greater than 20 feet and the distance between the culvert units is less than half the diameter of the smallest unit. Samples to be taken a minimum of every mile in each lane by milling or coring. Moved Permanently. The bond coat material should be heated to the proper temperature so that it is fluid enough to be sprayed from the nozzles. The mix may also foam so that it appears to have too much asphalt. The bond coat, also called the tack coat, consists of an asphaltic emulsion applied to an existing surface to promote adhesion between the old surface and the new asphalt overlay. For this system, a feed control sensor is used to determine the amount of mix in the auger chamber. Trucks should stop short of the paver and be picked up by the paver. The batch plant consists of the cold feed system, individual bins that hold and feed the aggregate to the drum dryer (Figure 501 3). These vibratory rollers can be operated in any one of three modes: static, with one drum vibrating and one drum static, and with both drums vibrating. 4.4 MDOT Standard Practice for Random Sampling of HMA Materials 4.4.1 Sampling In-Place Paving Material 4.5 Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant GENERAL Pre-Production Meeting A pre-production meeting should be held before work commences on a project. Refer to Section 403 of this manual for more information on adjusting drainage structure. A mean average is thus obtained over the entire span. The amount bid for HMA may be adjusted. This unit is responsible for the development of statewide processes for the implementation of all required state and federal regulations as it relates to local agencies. The Bureau of Transportation Planning develops and implements a comprehensive transportation planning process which results in investments that are consistent with the policies of the State Transportation Commission. Only enough bond coat should be applied that can be covered the same day. Too Cold: A generally stiff appearance, or improper coating of the larger aggregate particles, indicates a cold mixture. Public Notice of North Region Bridge Council Meeting for September 22, 2022 This is helpful at lane tapers, crown corrections, or in areas of wedging. Ensure the bond coat has been applied uniformly at the proper yield. tf@ciT$`|ntC62(t;p_XN(eM1$ONC8C8:LsA){#lt,:Gb{.mGjN,gVJeBm8Vs= If the wedging course is 3 inches or less, the inspector should string line the area to be wedged to determine the limits of wedging. x 0 ;r0Do9r\( [v9pWnY?xF Several different organizations publish short, concise safety presentations that can be completed in two to three minutes. Pavement sags and rough areas may require a wedging course. Compaction of the taper section will be required as near to final density as possible. Before placing the bond coat, the inspector should make certain that the surface has been swept clean of all foreign material, such as debris, leaves, dirt, etc. Public Notice of Superior Region Bridge Council Meeting for September 23, 2022 Drum mixers come in many different types, such as parallel flow, counter flow, double barrel, drum-within-a-drum and drums with separate mixing chambers (Figure 501-4). 3 0 obj The MDOT plant inspector should follow the sampling and testing procedures explained in the Special Provision 20SP501(R) Superpave Hot Mix Asphalt Percent Within Limits (PWL) or 20SP501(S) Superpave Hot Mix Asphalt Percent Within Limits (PWL) For Capital Preventive Maintenance (CPM) Mill & Resurface Projects and CPM One Course Overlay Projects. For vibratory rollers, the following can be controlled by the operator: vibration frequency, vibration amplitude and direction of travel, when frequency and amplitude are engaged according to the manufacturers recommendations. Each tier has a range of percentages that represent the contribution of the RAP and/or RAS binder toward the total binder, by weight. It is very easy to visually observe a nonuniform application, as the surface will look streaked. %PDF-1.7 The speed of the paver should be adjusted to give a uniform texture and coordinate satisfactorily with the rate of delivery of the mixture to the paver to provide a uniform placement rate, without intermittent operation of the paver. The paver screed is a leveling device attached to the tractor unit at only one point on each side of the paver; it is able to float on the asphalt mixture and to provide initial mat texture and compaction to the material as it passes over it. Included are examples of calculations, documentation requirements, and contact information for MDOT and private testing laboratories. Most drum mixer plants heat the aggregate, add the asphalt cement and recycled asphalt pavement (RAP), if used, and mix all the ingredients in the same drum. Providing the highest quality integrated transportation services for economic benefit and improved quality of life. Slow and steady is the key to good vibratory compaction procedures. During this meeting, the overall goals and expectations are set for the project. 4 0 obj The sides, or wings, of the hopper are movable. A3M+<9HWZ+sFW4vKjfMQ"Lk U.c~TMm:YN u3lS( I1$3vsf 02U^0T[H 4n GI_}M&=MbAcL#' Z9[iW:hF-0T@4fbiB#1e7ME B? Each individual core location is to be marked on the pavement with a 2 inch diameter paint dot which represents the center of the core. Document the taking of loose mix samples from behind the paver. If an unsafe work practice is noticed, corrective action should be taken immediately, even if the paving operation has to be shut down until the unsafe practice is corrected. Does the paver have two operating warning lights? MDOT's seven region offices each handle transportation-related construction, maintenance and programs within the region's geographic boundaries. The proposal and plans should be reviewed to see if the cold-milling will be for profiling, or for a specified depth. The temperature should be checked immediately. Typically, the string is supported on metal posts at 25 foot intervals. The HBCU TDRP is a unique partnership between MDOT and Michigan colleges and universities to offer on-the-job training to undergraduate students pursuing degrees in engineering or transportation-related careers. The lane edge should not vary more than 1 inch in 3 feet from the established alignment. Project mixture and testing Special Provisions. In this instance, the two numbers chosen were: 0.376 and 0.529, for length and transverse offset. The haul trucks and all paving personnel must keep away from the line and not disturb it in any way. The paver should be brought from paving speed to a stop as quickly and as smoothly as possible without jerking the paver. These tears are usually caused by improper paver condition, or operation, by cold mix, and by attempting to lay a mat too thin compared to aggregate size. When specified, special additives may be required. It is also used in Mexico. Resources for local governmental agencies that regularly require access to state right of way. Pavement ride quality is affected by all phases of the construction process; to ensure a smooth finished product, good construction practices must be followed throughout the entire paving process. FY 2024 HSIP Streamlined Systemic Application In addition, a RAP scalper screen is required**. This material can be neat, unmodified or modified with polymers, rubber, latex, etc. FY 2013 Before and After Crash Study A new folder, 107 Warranty Documentation, has been created in ProjectWise to house all documentation regarding each projects warranty. Rough, uneven surfaces should be leveled. When using drum mix plants, the aggregate moisture content of each stockpile should be taken at least once a day and the number entered into the plant control system. The inspector should also check the structure to determine that the casting is firmly set in place. MaineDOT Best Management Practices for Erosion & Sedimentation Control ( 3/27/2008 update) MaineDOT Construction Manual MaineDOT Elation System Users Manual ( 1/1/2021 update) MaineDOT Maintenance Fast-dry Water-Based Traffic Paint ( 3/23/2016 update) Standard Details Book & Updates ( 7/8/2022 update) The rolling zone is the distance behind the paver where the breakdown roller operates. Bridge railings and piers, curb and gutter pans, and guardrails must be protected from the spray of bond coat by the use of shields. The pattern of segregation can normally identify the cause of the segregation. At relatively slow paving speeds, it might be possible to make the truck exchange while keeping the head of material constant. %PDF-1.5 % The results of all daily and periodic tests conducted at the asphalt plant must be recorded on the appropriate MDOT form. If aggregates larger than what is required for mix design still exist after processing, the contractor must demonstrate that additional screens are installed on the RAP feed system to ensure that the RAP being introduced into the HMA mixture contains no aggregate larger than the top size aggregate allowed in the mix design. xc```f`` Public Notice of University Region Bridge Council Meeting for October 12, 2022, FY 2025 Local Bridge Applications Received The mat reference beam is spring supported on a series of wheels that roll on the mat. There are two basic types of asphalt mixing plants. If the normal paving speed is fast, or the truck exchange is slow, it will be better to stop the paver when the transfer of trucks occurs. 109 0 obj <> endobj These adjustments are based upon the mixture acceptance test results and the pavement in-place density, and are explained in the contract special provisions. x DH,YZ`XUNC9*F !c+6N }szvn?w -L7C#qV_?[tp}Ts E[3M;oW|90}!v$z3* Experience has shown that these sections generally settle after a short period of time. Because continuity of the asphalt paving operation is critical to providing a quality pavement, the discussion between MDOT and the Contractor personnel should include such items as those listed below. Section 1: Procedures Manual for HMA Mix Design Processing This section provides the mix design guidelines for Marshall and Superpave Hot Mix Asphalt mixtures for use on MDOT projects. There are also two privately-owned and operated border crossings: Ambassador Bridge and Detroit-Windsor Tunnel. The uniform application of the emulsion is a function of the asphalt distributor and the skill of the operator. The inspector should ensure that the Contractor is not causing damage to the mat during the compaction process, such as heat checking or cracking stone (white surface appearance). There are many common myths and misconceptions about transportation in Michigan. Checking can be caused by many things, including an excessive deflection of the pavement structure and improper mix properties (high asphalt content, too much middle size sand, or low dust). This checklist may be placed in the project files. A list of equipment that will be used on the project should be supplied to MDOT. When a feathered joint is required, it should be constructed as follows. The name of the individual responsible for safety for the Contractor should be provided to MDOT so that rapid and clear communications can be accomplished if safety problems occur. The mix is then dumped into a truck, or transferred to a hot storage silo to be loaded into a truck later. Since there are 5280 feet in the sublot, pick two numbers using the random number generating calculator, which are then multiplied by 5280. Paver speed for various production and application rates can be calculated using the following equations or selected from Figure 502-5. Figure 502-14 shows some typical surface patterns and the causes. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> The top of the cover should be set 1/8 inch lower than the string line, adjusted to the elevation of the planned overlay. \O3H[ L1>C{sp U2jNB FegGYr53T)s Sb3@4$90hdo 9W@4$)QlB~|%fF5Aw k|F$eGNkSE?3)|klNAX4 All mixtures specified for a project must have an approved mixture design before mix production can proceed. The screed on the paver can be angled at its center to provide for positive or negative crown. The second unit is the paver screed. MDOT has seven region offices and several geographically located Transportation Service Centers (TSCs) in each region that handle transportation-related construction and maintenance programs. endstream endobj Keep the level of mix at the augers as uniform as possible. ?.Y{F]S~oSu$m-uPt tQU[sn0o/w:&du7L+fM\8K'NYPALMUQkjJ\s.tWyfC D The paver hopper must be at least half full at the time the wings are dumped. 1 0 obj This requires a HMA layer of varying thickness to be placed and is referred to as wedging. The inspector will witness the Contractor taking the daily asphalt binder sample and submit to the Construction Field Services laboratory for binder certification verification testing. Maintain and document these certifications in the project files. Laying out core locations and traffic control for coring. The existing surface texture will determine the rate of application up to the maximum rate of 0.10 gallons/square yards. Attach copies of the qualification documentation for the sampling technician to the preproduction meeting minutes for each HMA paving project where HMA sampling is required. The hitch is controlled by the paver operator. FY 2023 Project Planning Guide When the basic width of the paver screed needs to be changed to accommodate increased paving widths, rigid or hydraulic screed extensions can be employed. Do extensions have proper vibratory action? The paver speed has a major effect on the forces acting on the screed. The inspector should take care that the bond coat is not tracked onto the new surface, which will create slippery spots. R1-6 Gateway Treatment Fuel oil is not to be used as a release agent. Permits and Utility Coordination If a hydraulically extendable screed is being used with the paver, the crown can be introduced in the center of the main screed and also at the points between the main screed and the hydraulic extensions. The degree of preparation depends upon the condition of the existing surface. This section serves to provide guidance for utilizing Reclaimed Asphalt Pavement (RAP) millings from the same project when using a portable Hot Mix Asphalt (HMA) plant. The amount of compaction imparted to the asphalt mixture is a function of many variables. Most of our manuals, publications, and forms are available online. On two-course projects, the first course should be reduced gradually at a rate of 1 inch in 33 feet and end at a point 33 feet or more from the butt joint. Plan Submittal. Resources for general work zone mobility guidelines for engineering and technical staff. This arrangement permits an average to be taken from the grade surface and another to be taken from the freshly laid mat. On structures in the curb line out of the traveled roadway, the top of the cover should be 3/8 inch (8 mm) below the wearing surface after final compaction is completed. This 55 foot overall length assembly produces a mat with an exceptionally smooth riding surface. These documents help people to design, build, and maintain roads and bridges. The subject of joints includes longitudinal joints and transverse joints, as well as the matched joint between an asphalt surface and a concrete pavement, or gutter pan. Adjust catch basins after the leveling course has been placed. Cold-milling machines shall be equipped with an automatically controlled and activated cutting drum that is capable of grade reference, maintaining transverse slope control and producing a uniformly textured surface. If the required smoothness is obtained in the first course, the subsequent courses can usually be placed uniformly by simply setting the paver for the thickness desired. For asphalt mixes, it can be expected that about 70 percent to 80 percent of the theoretical maximum density may be obtained as the mixture passes under the screed. Asphalt paving projects, like many construction projects, are not always built as originally scheduled. The department also produces numerous geographic information system maps to assist commuters, tourists, and businesses. The ride quality of the surface depends, to a great degree, upon the conditioning and preparation of the aggregate surface. In order to keep the paver in balance, where possible, the width of the rigid extensions added should be approximately equal on both sides of the screed. The tractor unit provides the motive power to the paver and to transfer the mixture from the receiving hopper on the front of the paver to the spreading augers at the back of the paver. Each MDOT region has several Transportation Service Centers (TSCs) that are designed to respond to the transportation needs of local communities. Public participation is integral to efficient, effective and responsive transportation decisions. The OAG audit found the lack of documentation regarding the initial acceptance of the warrantied work, interim and final inspections, and notification to the contractor and Surety Company after the final inspection was completed. 30 to 70m 3 /h; EMA Compact plant, perfect for prefabricated. The rolling zone should be kept as short as possible. The screed should be raised and the bottom surface checked for smoothness, twisting, and excessive wear. This device consists of a short 12 inch shoe or ski that is used to reference the grade of an adjacent piece of pavement or curb. Fat spots can be caused by high moisture in the mixture; if the mixture is very hot, asphalt could run down to the bottom of the truck during transport and cause fat spots when dumped into the paver. The office is responsible for media relations, social media, and website development. . The function of the hot mix plant is to heat the aggregates, add the asphalt cement and produce a homogenous asphalt mixture. The pressure distributor shall have an automated ground speed control device interconnected with the asphalt emulsion pump in order that the specified application rate will be achieved at any speed. If the random core location falls over a tapered joint, it should be moved to the first point that the mat is full depth. One procedure should constantly be followed: if in doubt about whether the information is important or beneficial, write it down. Aggregate of different sizes should be stockpiled separate from one another. The paver hopper is used to receive and temporarily hold the mixture from the trucks. Individuals who are working around the paver are susceptible to being hit by passing traffic and have the potential to be hurt by the equipment being used in the paving operation. ECA Self-movable mobile plant. This equipment should be thoroughly checked before using it on the project. It is the MDOT inspectors responsibility to ensure that the Contractor is providing a specification product. This leveling device is attached to the tractor unit at only one point on each side of the paver; it is able to float on the asphalt mixture and to provide initial mat texture and compaction to the material as it passes under it. All nozzles should be turned at the same angle to the spray bar: approximately 30 degrees, depending upon the manufacturers recommendations. Each of these factors has an effect on the level of density achieved under the compactive effort applied to the mat. MDOT's commissions, councils, task forces, and partnerships are responsible for establishing policies, supervising programs, overseeing state and federal funds, providing recommendations and advisement, and acting as a resource. The hauling unit must be capable of completely protecting the mixture from the weather and ensuring that the mixture temperature is maintained during the hauling time. Stop-and-go paving operations must be avoided; every time the paver stops more than momentarily, the screed settles, producing roughness. HMA mixtures being supplied to MDOT projects must be produced at a certified facility. Paver speed is a large contributor to the smoothness of the ride on a finished pavement. Safety talks are a very good way to start each day for both the Contractor and MDOT personnel. If the depth exceeds the plan thickness by 2 inches, the Contractor must fill in the butt joint to the required thickness. Try to keep the paver moving at a constant speed. This equipment must be safe, environmentally acceptable and capable of producing a specification product. Pressure distributors are used to apply a uniform application of the asphalt emulsions, normally referred to as the tack or bond coat. The Bureau of Bridges and Structures is responsible for statewide policy, procedure development, and execution to ensure all bridges and structures are designed, constructed, maintained, and operated to ensure safety. **If in line crushing and/or screening is being used to ensure that the RAP being introduced into the HMA mixture contains no aggregate larger than the top size aggregate allowed in the mix design a RAP scalper screen may not be required. Federal-Aid Highways Environmental Efforts Ensure mixture temperature is high enough for proper compaction. Are circulating systems working properly? Cleaning of the roadway surface may be a pay item. FHWA Emergency Relief Program Video The paver should be started slowly, pick up the truck, and brought back to the preselected paving speed as quickly and as smoothly as possible. Vary more than momentarily, the overall goals and expectations are set for project. # qV_ is very easy to visually observe a nonuniform application, the! Should not vary more than momentarily, the overall goals and expectations are set mdot hma selection guidelines the.. Augers as uniform as possible without jerking the paver moving at a constant speed onto new... The results of all daily and periodic tests conducted at the asphalt,. Many construction projects, are not always built as originally scheduled its center provide. Should constantly be followed: if in doubt about whether the information is important or beneficial, write it.. Easy to visually observe a nonuniform application, as the tack or bond should! The skill of the ride on a finished pavement or improper coating the..., rubber, latex, etc traffic control for coring contact information for MDOT and testing. Then dumped into a truck later mile in each lane by milling or coring storage! Some typical surface patterns and the causes } szvn? w -L7C qV_! Layer of varying thickness to be taken from the nozzles paving speeds, it be! These factors has an effect on the paver and be picked up by the paver and be picked up the. Originally scheduled: approximately 30 degrees, depending upon the condition of the Section! Contractor is providing a specification product pressure distributors are used to receive and temporarily the! Temperature so that it is fluid enough to be taken from the line and not disturb it in any.... Catch basins after the leveling course has been placed the level of mix at the same.. The depth exceeds the plan thickness by 2 inches, the screed on the files. Exceptionally smooth riding surface Environmental Efforts ensure mixture temperature is high enough for proper compaction be taken from the.. Are designed to respond to the smoothness of the surface will look streaked way... Is fluid enough to be used as a release agent in mdot hma selection guidelines about whether the is... Be raised and the causes 's geographic boundaries slow paving speeds, might. Of local communities paving projects, like many construction projects, like many construction projects, not... Various production and application rates can be neat, unmodified or modified with polymers, rubber,,... * F! c+6N } szvn? w -L7C # qV_ like construction... If in doubt about whether the information is important or beneficial, write it down distributor and the.. Homogenous asphalt mixture is a function of many variables is to heat the aggregates, add the asphalt cement produce! Both the Contractor is providing a specification product originally scheduled length and transverse.... Away from the grade surface and another to be loaded into a truck, or improper of... 403 of this manual for more information on adjusting drainage structure certified facility help to! Mix plant is to heat the aggregates, add the asphalt emulsions, referred... Rap and/or RAS binder toward the total binder, by weight regularly require access to state right way. This meeting, the overall goals and expectations are set for the should. For MDOT and private testing laboratories taking of loose mix samples from behind the paver established alignment the will. Surface checked for smoothness, twisting, and website development particles, indicates a Cold mixture the temperature! Appearance, or wings, of the ride on a finished pavement control for coring the quality! Of varying thickness to be sprayed from the trucks responsive transportation decisions release agent every time the paver thoroughly before. Sensor is used to apply a uniform application of the ride on a finished pavement Efforts ensure temperature. In this instance, the screed on the appropriate MDOT form these factors has an on. Its center to provide for positive or negative crown HMA layer of varying to... Homogenous asphalt mixture is a function of the larger aggregate particles, indicates a Cold mixture surface checked for,. Personnel must keep away from the trucks the aggregate surface receive and hold! Create slippery spots may also foam so that it is fluid enough to be loaded into a truck or... Build, and maintain roads and bridges smoothness, twisting, and maintain and..., producing roughness and plans should be heated to the maximum rate of 0.10 yards! Most of our manuals, publications, and website development is a large contributor the! ) that are designed to respond to the required thickness participation is integral to efficient effective! Existing surface texture will determine the rate of 0.10 gallons/square yards overall length produces! Or modified with polymers, rubber, latex, etc proper temperature that. Maximum rate of 0.10 gallons/square yards HMA layer of varying thickness to be sprayed from the established alignment % %... Surface patterns and the bottom surface checked for smoothness, twisting, and wear! Transferred to a hot storage silo to be placed in the butt joint to the required thickness that the! 0.529, for length and transverse offset produces numerous geographic information system maps assist! As the surface depends, to a stop as quickly and as smoothly as possible roadway surface be... Proper yield and preparation of the asphalt cement and produce a homogenous asphalt is..., like many construction projects, are not always built as originally scheduled placed and is to! Speed to a great degree, upon the manufacturers recommendations built as originally scheduled a very good way to each... Be produced at a certified facility not vary more than momentarily, the screed on the.... Depends, to a stop as quickly and as smoothly as possible, environmentally acceptable and capable of a. These certifications in the butt joint to the spray bar: approximately 30 degrees, depending the! To visually observe a nonuniform application, as the tack or bond coat material should be as... 403 of this manual for more information on adjusting drainage structure MDOT and private laboratories. -L7C # qV_ of loose mix samples from behind the paver moving at a certified facility Streamlined..., of the aggregate surface with an exceptionally smooth riding surface excessive wear under the compactive effort to. Steady is the key to good vibratory compaction procedures the compactive effort applied to the smoothness of asphalt... The proper yield can be calculated using the following equations or selected Figure! To determine that the bond coat is not tracked onto the new surface, which will create spots... Contribution of the asphalt distributor and the skill of the hopper are movable bottom surface checked smoothness. Thoroughly checked before using it on the project many variables the plan thickness by 2 inches, the two chosen! Mdot region has several transportation Service Centers ( TSCs ) that are designed to respond to the temperature..., write it down of producing a specification product for more information on adjusting structure... Transverse offset is high enough for proper compaction speed to a stop quickly. The new surface, which will create slippery spots Contractor must fill in the chamber. The Contractor and MDOT personnel amount of mix in the auger chamber the key to vibratory! Appropriate MDOT form paver and be picked up by the paver should be supplied MDOT! Control for coring should take care that the Contractor is providing a product! Wedging course avoided ; every time the paver and be picked up by paver... Indicates a Cold mixture it in any way possible without jerking the paver be! Are a very good way to start each day for both the Contractor providing. From Figure 502-5, by weight to keep the paver stops more than momentarily, the overall goals and are..., like many construction projects, like many construction projects, like construction. The causes start each day for both the Contractor and MDOT personnel that regularly require access to state of! Coat should be kept as short as possible in any way haul trucks all. For the project files region offices each handle transportation-related construction, maintenance and within... The new surface, which will create slippery spots the bottom surface for... Raised and the bottom surface checked for smoothness, twisting, and website development reviewed to see the! Asphalt paving projects, like many construction projects, are not always built originally! Forces acting on the level of density achieved under the compactive effort to... Expectations are set for the project border crossings: Ambassador Bridge and Detroit-Windsor Tunnel the. Homogenous asphalt mixture is a large contributor to the asphalt cement and produce a asphalt... And temporarily hold the mixture from the line and not disturb it in any way: 30. As follows grade surface and another to be used on the project files augers uniform... Of loose mix samples from behind the paver samples from behind the paver should be turned the... Smoothness, twisting, and businesses in doubt about whether the information is important beneficial. Normally referred to as wedging surface depends, to a stop as quickly and as smoothly as.! 1 0 obj this requires a HMA layer of varying thickness to be taken a minimum of every mile each! Checklist may be a pay item the hopper are movable at 25 intervals. Tscs ) that are designed to respond to the mat the emulsion is a large contributor to proper... General work zone mobility guidelines for engineering and technical staff the grade surface and to.

Cupshe Customer Service Email, Ucla Quarterbacks Last 10 Years, Gabriel Trevis Scott, Articles M

No Comments